This trip was spent in conferences with H. Etherington, A. Amroni, Geo. Anderson, and L.W. Fromm; and in inspection of components now being built for the Navy Test Rig which is to be installed at H Pile. Mr. Anderson believes that the entire assembly will arrive at Hanford between January 16 and 23, 1950. Much has yet to be designed and built, however. Also, certain incompatibilities with the H Pile were pointed out, and will be altered.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Trip report: Argonne National Lab., Naval Reactor Division, December 12--13, 1949


    Beteiligte:
    J. B. Lambert (Autor:in)

    Erscheinungsdatum :

    1949


    Format / Umfang :

    5 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch