The report covers a survey and analysis of the factors involved in bringing automobiles into the market place with emphasis on production engineering, prototype testing and tooling for production of the automobile and the oxidizing catalyst.
Production Lead Time of 1975/76 Model Years. Volume I. Executive Summary
1972
51 pages
Report
Keine Angabe
Englisch
Production Planning & Process Controls , Air Pollution & Control , Automotive industry , Manufacturing , Production engineering , Exhaust emissions , Lead time , Air pollution control equipment , Catalytic converters , Tests , Cost engineering , Systems engineering , Catalytic reactors(Exhaust systems)
GEOS 3. Volume 1: Executive Summary
NTIS | 1979
|INFORM Evaluation. Volume 2. Executive Summary
NTIS | 1992
|