A description is presented of a functional organization designed to prepare and launch satellite vehicles and produce reliable test and evaluation data. Considered are LMSD engineering, technician, and direct-support personnel required to operate and maintain Launch Complex I at Point Arguello. The data provided will be limited to activities defined in the integrated test philosophy and predicated on a schedule of one satellite launch per month from each of the two launch pads at Launch Complex I, Point Arguello.
Samos/Midas Personnel System Specifications and Design Launch Complex I Point Arguello
1961
87 pages
Report
Keine Angabe
Englisch
Personnel Management, Labor Relations & Manpower , Manned Spacecraft , Guided missile personnel , Satellites(Artificial) , Manpower , Launching sites , Engineers , Electronic technicians , Test facilities , Ground support equipment , Guided missile components , Launch vehicles , Booster rockets , Launching , Preparation , Scheduling , Operational readiness , Checkout procedures , Job analysis , Military requirements , Systems engineering , Midas , Samos