The primary purpose of the study was to add to the findings of a two-year pilot study on pavement monitoring. The investigation centered on monitoring equipment as well as monitoring methodologies. The long-term nature of the study permitted observations of pavement performance from essentially new, or rehabilitated pavements to a deteriorated state where rehabilitation was once again needed. Testing equipment ranged from high-speed profilometers to a simple six-foot straight edge. Results of the study show a typical slow increase in rutting, and relatively stable deflection values. A remarkably characteristic trend was found in pavement cracking, showing an exponential growth pattern. In the area of equipment it was found that because of lack of calibration, continuity in the database was not feasible.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Long-Term Pavement Monitoring


    Beteiligte:
    W. Hutter (Autor:in)

    Erscheinungsdatum :

    1988


    Format / Umfang :

    56 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch