The magnitude of scheduled airline operations at civil airports has made it imperative that runway repair and overlay with hot mix asphaltic concrete be accomplished at night so as not to interfere with normal airline flight schedules. Technical data and recommended construction practices such as working hours, construction lighting, automatic grade control, standby equipment, compaction, construction of transition and other related items are discussed in this study. Experiences of nighttime overlay construction at seven municipal airports are documented in Appendix C. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Study of Nightime Pavement Construction Practices - Asphaltic Concrete


    Beteiligte:
    W. P. Wills (Autor:in)

    Erscheinungsdatum :

    1976


    Format / Umfang :

    91 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch