Sizing data is presented for various combinations of Mars missions and chemical-propulsion/aerobraking vehicles. Data is compared for vehicles utilizing opposition (2-year mission) and conjunction (3-year mission) trajectories for 1999 and 2001 opportunities, for various sizes of vehicles. Payload capabilities for manned and unmanned missions vehicles and for propulsive-braking and aerobraking cases are shown. The effect of scaling up a reference vehicle is compared to the case of utilizing two identical vehicles, for growth in payload capability. The rate of cumulative build up of weight on the surface of Mars is examined for various mission/vehicle combinations, and is compared to the landed-weight requirements for sortie missions, moving-base missions, and fixed-base missions. Also, the required buildup of weight in low Earth orbit (LEO) for various mission/vehicle combinations is presented and discussed.
Mission and Space Vehicle Sizing Data for a Chemical Propulsion/Aerobraking Option
1986
12 pages
Report
Keine Angabe
Englisch
Aerobraking Space Transfer Vehicle
NTIS | 1990
|The aerobraking space transfer vehicle
NTRS | 1990
|Mars Global Surveyor: Aerobraking Mission Overview
NTRS | 1998
|Mars Global Surveyor: Aerobraking Mission Overview
AIAA | 1999
|