The Navy intended for the Ford Class aircraft carrier to improve combat capability while reducing acquisition and life-cycle costs. However, as GAO has reported on extensively since 2007, the lead ship has experienced cost growth of nearly 23 percent, with a reduced capability expected at delivery.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    FORD-CLASS AIRCRAFT CARRIER:Follow On Ships Need More Frequent and Accurate Cost Estimates to Avoid Pitfalls of Lead Ship


    Beteiligte:
    M. Mackin (Autor:in)

    Erscheinungsdatum :

    2017


    Format / Umfang :

    56 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch