There is an urgent requirement for a reliable, quickly erectable and easily maintainable shelter which will protect equipment from adverse weather conditions when maintenance is required on Marine Corps aircraft, to include the CH53E. This shelter will be constructed of materials that will not deteriorate in storage, will not rot in mildew, and will be easy to handle when wet or subjected to extreme temperatures. The Initial Operational Capability (IOC) required for this system is FY 1985. (Author)
Required Operational Capability (ROC) Number LOG 1.56 for an Expeditionary Aircraft Maintenance Shelter
1983
9 pages
Report
Keine Angabe
Englisch
DRY SHELTER FOR INCREASING THE OPERATIONAL CAPABILITY OF A SUBMARINE
Europäisches Patentamt | 2018
|