This report describes the progress on the Engineering and Test Support Services for Railroad Instrumentation, Data Acquisition, Processing and Evaluation Program from 1 July 1977 through 30 June 1978. The report covers operation of the FRA track-geometry-measurement, data acquisition and rail-flaw-detection fleet, as well as track survey operations and the related data processing. The report also describes special tests on Lightweight Flatcar Evaluation, Full-Scale Aerodynamic Tests of Trailer-on-a-Flatcar, Piggyback Evaluation, Maintenance-of-Way, Passenger Vehicle Studies, Dynamic Locomotive Testing, and Track Stiffness Measurement System Evaluation. Fabrication and installation of the new Wayside Detection Facility at TTC is also described herein.
Test Train Program. Tenth Annual Report
1979
99 pages
Report
Keine Angabe
Englisch
Test Train Program Eleventh Annual Report
NTIS | 1981
Engineering Index Backfile | 1939
Test Train Program. Ninth Progress Report
NTIS | 1977
Test Train Program Sixth Progress Report
NTIS | 1974
|1989 tenth annual engine roundup
Kraftfahrwesen | 1989