The Proposed Action is to construct a new mailroom facility for the 911 Airlift Wing (A W), Pittsburgh International Airport (lAP) Air Reserve Station (ARS) located at the Pittsburgh International Airport (PIA), Coraopolis, P A. Outside mail received from the US Postal Service is received at a central facility located in the base headquarters building and operated by the Information Systems Flight. Force protection objectives and the physical security program at the 911 A W require a separate building for the base mailroom function due to the potential effects of terrorists activities that may occur through the base mail. Under the No Action Alternative, the current mailroom in the headquarters building would continue to be operated and the base would not be able to effectively meet security requirements.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Abbreviated Environmental Assessment: JLSS 03-0024 Construct Mailroom Building


    Erscheinungsdatum :

    2003


    Format / Umfang :

    21 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    2005-01-0024 A Novel Approach to Catalyst OBD

    Jones, J. C. P. / Muske, K. R. / Society of Automotive Engineers | British Library Conference Proceedings | 2005


    2000-01-0024 From Painted "Scrap" To Painted Production Parts

    VeRonica, M. / Carroll, M. / SAE | British Library Conference Proceedings | 2000


    2011-01-0024 GM Approach to Chassis Based Load Management

    Schudt, J.A. / Geisler, R.L. / Society of Automotive Engineers | British Library Conference Proceedings | 2011