NASA Goddard Space Flight Center requires that each project demonstrate a minimum of 5 C margin between temperature predictions and hot and cold flight operational limits. The bounding temperature predictions include worst-case environment and thermal optical properties. The purpose of this work is to: assess how current missions are performing against their pre-launch bounding temperature predictions and suggest any possible changes to the thermal analysis margin rules
Statistical Analysis of Thermal Analysis Margin
2011
19 pages
Report
Keine Angabe
Englisch
HIGH TEMPERATURE THERMAL MARGIN
TIBKAT | 2020
|Time-Delay Margin Analysis for an Adaptive Controller
Online Contents | 2012
|Weight and KG Margin Analysis of Naval Surface Ships
British Library Conference Proceedings | 1997
|