This document presents an estimate of selected costs for the development, production, and operation of the Heavy Lift Helicopter (HLH) for consideration during the ASARC process in early FY 75. Because of stringent time constraints imposed on this analysis, the cost estimates have been limited to those cost elements which are either high in dollar amount or which appear to be areas where significant contributions can be made. This report, due to the grossness of the costs presented, also attempts to specify confidence levels in the costs and to indicate the sensitivity of the estimates to possible changes. (Author)
An Independent Estimate of Selected Costs of the Heavy Lift Helicopter
1974
66 pages
Report