This paper represents an effort to extract the information pertinent to projection of depot maintenance cost on new or proposed aircraft from the available cost history of the Air Force fleet. Regression analysis was employed to develop Cost Estimating Relationships (CER's) which relate depot maintenance cost and aircraft physical/performance characteristics. The resulting CER's are intended as an aid to cost analysts attempting to estimate depot maintenance cost early in the procurement cycle of proposed aircraft. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Depot Maintenance Cost-Estimated Relationships for Turbine Powered Aircraft


    Beteiligte:
    J. L. Durr (Autor:in)

    Erscheinungsdatum :

    1968


    Format / Umfang :

    54 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch