Bruker has manufactured twelve additional coils since modifying their epoxy impregnation process. Testing produced failures at unwetted fiberglass locations. These areas were easily repaired and coils then passed the electrical tests. All coils manufactured previously are being repaired and tested. Future coils will be constructed with a modification to eliminate unwetted fiberglass and the need for repairs should be greatly reduced. It is expected that twelve coils will be shipped to BNL via air freight before December 7, 1989 and an additional ten coils will be shipped before December 11, 1989. Another twenty coils should be shipped before December 31, 1989 and two hundred coils will be shipped before June 30, 1990. Bruker had submitted a bid in response to BNL's RFQ for power supplies for the Booster and AGS tune control systems. They can meet our general requirements but cannot conform in exact detail to our standards for interlocks, monitoring and safety but are willing to add circuitry to meet our needs in principle. They supplied the remaining technical information required by BNL to evaluate their quotation.
Shipment and tests of the AGS Booster quadrupole coils. Foreign trip report, November 26-30, 1989
1989
4 pages
Report
Keine Angabe
Englisch
Physics , Beam Focusing Magnets , Brookhaven AGS , Manufacturing , Data Processing , Federal Republic of Germany , Measuring Methods , Modifications , Monitoring , Particle Boosters , Performance Testing , Power Supplies , Quadrupoles , Task Scheduling , Technology Assessment , Travel , EDB/430200 , EDB/426000
Bulk shipment transport barge for bulk shipment systems
Europäisches Patentamt | 2017
BULK SHIPMENT TRANSPORT BARGE FOR BULK SHIPMENT SYSTEMS
Europäisches Patentamt | 2016
|Engineering Index Backfile | 1920