In July 2007, the National Aeronautics and Space Administration (NASA) Office of the Chief Engineer (OCE) chartered the NASA Instrument Capability Study (NICS) team to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The Study team was also chartered to determine if occurrences seen recently are coincident, but isolated cases or if there were generic issues causing such degradation. If the issues were found to be generic, the team was to offer solutions to recover such capability.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    NASA Instrument Capability Study


    Beteiligte:
    J. Leon (Autor:in)

    Erscheinungsdatum :

    2008


    Format / Umfang :

    81 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    NASA Propulsion Capability Leadership

    Brown, Thomas | NTRS | 2018



    NASA Capability Roadmaps Executive Summary

    Willcoxon, Rita / Thronson, Harley / Varsi, Guilio et al. | NTRS | 2005


    NASA NDE Enterprise Capability Assessment

    Jess M Waller / Charles T Nichols / Bryan Bookhart | NTRS | 2021


    NASA NDE Enterprise Capability Assessment

    J. M. Waller / C. T. Nichols / B. Bookhart | NTIS | 2021