The magnitude of scheduled airline operations at civil airports has made it imperative that runway repair and overlay with hot mix asphaltic concrete be accomplished at night so as not to interfere with normal airline flight schedules. Technical data and recommended construction practices such as working hours, construction lighting, automatic grade control, standby equipment, compaction, milling, stress absorbing membrane, sawing joints in overlay, construction of transition and other related items are discussed in this study. The practices involving repair of existing pavements and construction of high quality overlays using asphaltic concrete are entirely possible during nighttime. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Current Practices on Nighttime Pavement Construction Asphaltic Concrete


    Beteiligte:
    W. P. Wills (Autor:in)

    Erscheinungsdatum :

    1982


    Format / Umfang :

    105 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Current Initiatives in Quality Asphaltic Pavement Construction: The Wisconsin Experience

    Schmitt, Robert L. / Whited, Gary C. / Waelti, Gerald J. et al. | Transportation Research Record | 1996



    Minimizing premature cracking in asphaltic concrete pavement

    Finn, F. N. / Nair, K. / Hilliard, J. M. | TIBKAT | 1978


    Current Initiatives in Quality Asphaltic Pavement Construction: The Wisconsin Experience

    Schmitt, Robert / Whited, Gary / Waelti, Gerald et al. | Transportation Research Record | 1996