This report presents the test data and analysis of all acceptance and type tests performed on the LACV-30-1 and -2 vehicles. The tests were performed as specified in Contract No. DAAK02-75-C-0149 dated 7 March 1975. All test data were accepted by the U.S. Army prior to delivery of the vehicles. Two corrective actions were required on the LACV-30-1, installation of a new horn and addition of bow pre-loaders to maintain pressure on the front landing pads during swing crane operation. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    LACV-30 Test and Demonstration Report


    Beteiligte:

    Erscheinungsdatum :

    1978


    Format / Umfang :

    160 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch