Large wind power plants have parts of considerable weight which must be assembled 80-100 m above ground. If the power plant parts are kept at a maximum weight of about 13 tons, helicopters can be used for the installation. In this report suggestions are given on the use of the helicopter and a cost comparison is given between helicopter installation and traditional installation. (ERA citation 10:048441)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Installation of Wind Power Plants Using Helicopters


    Beteiligte:
    B. A. Olsson (Autor:in) / A. Helmner (Autor:in)

    Erscheinungsdatum :

    1981


    Format / Umfang :

    39 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Turbo shaft engine installation problems in helicopters

    Yost, J.H. | Engineering Index Backfile | 1964


    Power for helicopters

    Engineering Index Backfile | 1949


    Power for helicopters

    Engineering Index Backfile | 1949


    Helicopters and aeroplane-helicopters

    Lame´ / M. | Engineering Index Backfile | 1921


    Theory and practice of gas turbine power plants for helicopters

    Bensen, I.B. | Engineering Index Backfile | 1953