This award was funded for the administration of ONR awards and ship costs. Funding received for Administration and Ship Costs were distributed into two accounts. The Administration budget, totaling $83,367, was spent on costs associated with the administration of the various ONR awards. These costs included clerical staff salary support for assistance with the preparation and distribution of the various ONR proposals, and for assistance with implementation of the ONR site reviews. Costs associated with the processing of the Omnibus proposal, such as materials and supplies, copying and mailing charges were also expensed. The budget included funds for domestic travel and computing subscription charges which were expensed. In addition, $421 was used for the repair of office equipment.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Administration and Ship Costs


    Beteiligte:
    A. Lerner-Lam (Autor:in)

    Erscheinungsdatum :

    1999


    Format / Umfang :

    2 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Administration and Ship Costs

    A. Lerner-Lam | NTIS | 1999


    Maritime administration prototype ship

    Engineering Index Backfile | 1951


    Reduction of ship propulsion costs

    Paro, D. / Berg, J. | Tema Archiv | 1979


    Ship stabilisation -- Costs and profits

    Palmer, R. | Engineering Index Backfile | 1965


    Estimation of ship construction costs

    Miroyannis, Aristides | DSpace@MIT | 2006

    Freier Zugriff