Various operational aspects of the Earth Radiation Budget Satellite (ERBS) Tracking and Data Relay Satellite System (TDRSS) are described. The ERBS-TDRSS Contract Planning System is an expert system which has been used operationally since June 1987 by the ERBS Flight Operations Team (FOT) at Goddard Space Flight Center to build weekly schedules of requests for service from the TDRSS. The basic operation of the system and significant enhancements and changes are discussed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Operational Aspects of a Spacecraft Planning/Scheduling Expert System


    Beteiligte:
    D. R. McLean (Autor:in) / R. G. Littlefield (Autor:in) / D. S. Beyer (Autor:in)

    Erscheinungsdatum :

    1987


    Format / Umfang :

    5 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Operational aspects of a spacecraft planning/scheduling expert system

    Mclean, David R. / Littlefield, Ronald G. / Beyer, David S. | NTRS | 1987



    ESSOPE: Expert System for Spacecraft Operations Planning and Execution

    S. Gusmeroli / A. Pezzinga / S. Barone et al. | NTIS | 1990


    Spacecraft Environmental Anomalies Expert System

    H. C. Koons / D. J. Groney | NTIS | 1994


    Operational aspects of spacecraft using space reactor power systems

    Josloff, A.T. / Chiu, W.S. | Tema Archiv | 1986