Transit Expressway envisions a system operating on fixed guideways with continuous headways as close as 90 seconds. The system is based on operating compact, minimum weight vehicles to provide economy of operations in off-peak hours and still maintain high frequency service. The all electric fully automated vehicles resemble buses and run on 4 pairs of driven pneumatic tires. The project is comprised of 9,360 foot long main guideway, principally on an aerial structure with a short section of at-grade guideway. Forms complete loop with stations at north and south ends. Rolling stock is 3 vehicles operated simultaneously or singularly. Specific discussion of test includes spur roadway with 10% grade, emergency walkway, grounding. Conclusions and recommendations are delineated. Appendices contain a glossary and summary of Phase I report.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Transit Expressway Report: Phase II


    Erscheinungsdatum :

    1973


    Format / Umfang :

    284 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Transit expressway

    Prytula, G. | Engineering Index Backfile | 1968


    Transit expressway

    Kerr, Jr., C. | Engineering Index Backfile | 1963


    Transit expressway -- New mass-transit system

    Walker, W.J. / Howell, J.K. | Engineering Index Backfile | 1965


    Transit expressway medium-density mass transit system

    Walker, W.J. / Howell, J.K. | Engineering Index Backfile | 1965