The report primarily deals with equipment used in the study. New equipment was brought on line for measurement of pavement smoothness, but the time delay did not permit testing of its effectiveness. The study then dealt with distress survey methods. The sensitivity analysis of cracking survey revealed that high speed windshield surveys can be of value for network level monitoring purposes.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Long-Term Pavement Monitoring. Evaluation of Improvements to Colorado's Pavement Management Program


    Beteiligte:
    W. Hutter (Autor:in)

    Erscheinungsdatum :

    1984


    Format / Umfang :

    43 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch