This report describes the status of MicroPAVER implementation at the airports included in the Texas Aeronautical Facilities Plan. In 1998, the research team inspected 41 airports with 56 runways, 54 primary aprons, and 62 primary taxiways. To date, 245 airports have been inspected and the resulting information entered into the MicroPAVER database. For this report, the aprons and taxiways were inspected, but the data was not entered. The list of airports is included in Table 1. The runways at all 245 airports have been inspected and the resulting information entered into the MicroPAVER database. Aprons and taxiways have been inspected at nearly 80 of these airports.