This report describes the procedures and results of a study to evaluate the impacts of Phase I of the I-10/I-17 freeway management system (FMS) on freeway traffic operations in the Phoenix, Arizona metropolitan area. A 'before and after' study design was used to evaluate several measures of effectiveness (MOEs) for 57 kilometers fo freeway that was outfitted with ramp meters, variable message signs, traffic loop detectors, and closed circuit television cameras (CCTVS). The primary MOEs consisted of mainline travel time, on-ramp travel time, driver response to the variable message signs (measured by the distribution of traffic volume), freeway accidents, incident response time, incident duration, and estimated noise and vehicle emission levels.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    I-10/I-17 Phase I FMS Evaluation


    Beteiligte:
    J. M. Witkowski (Autor:in) / G. Summers (Autor:in) / F. Mouasher (Autor:in) / M. J. Marum (Autor:in)

    Erscheinungsdatum :

    1997


    Format / Umfang :

    152 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Pavement Evaluation: Phase I. Pavement Evaluation Equipment

    R. L. Lytton / W. M. Moore / J. P. Mahoney | NTIS | 1975


    Incident Response Evaluation, Phase 3

    M. Hallenbeck / C. Pham / K. Watkins | NTIS | 2011


    Rotor System Evaluation. Phase 1

    R. M. Buckanin / W. Gould / P. W. Losier et al. | NTIS | 1988


    Fault Tolerant Testbed Evaluation, Phase 1

    V. Caluori / T. Newberry | NTIS | 1993


    F-101A Phase II. Flight Evaluation

    J. Strier / A. A. Julian | NTIS | 1955