Alternate corridors which were considered in determining the final, approved corridor and alignment location of the Interstate and Defense Highway 10 through the subject project area are discussed in the supplement. An evaluation is made of the past and present modes of transportation. The supplement contains a discussion and an analysis of air pollution factors and the anticipated impact the proposed highway will affect upon the air quality of the project area.
Projects I-10-2(28), Buckeye-Cemetry Road, I-10-2(31), Cemetry Road-Perryville Road, Ehrenberg-Phoenix Highway, Interstate and Defense Highway 10, in Maricopa County, Arizona
1972
136 pages
Report
Keine Angabe
Englisch
Environmental Pollution & Control , Environmental surveys , Highways , Arizona , Interstate highway system , Highway planning , Design standards , Traffic safety , Substitutes , Evaluation , Air pollution , Environmental impact statements , Maricopa County(Arizona) , Interstate highway 10 , Transportation modes
Engineering Index Backfile | 1921
|SAE Technical Papers | 1921
|