Because Display Channel Complex Rehost (DCCR) is a critical, yet short-lived, system and because of Federal Aviation Administration's (FAA's) poor track record in acquiring air traffic control (ATC) systems, we reviewed the DCCR acquisition. Our objectives were to determine (1) the portion of the recent major outages experienced at the five DCC-equipped en route centers that were attributable to DCC, (2) whether DCC was meeting its system availability requirement, (3) FAA's projections of future DCC outages and availability, and (4) whether FAA was effectively managing the DCCR acquisition to ensure delivery of specified capabilities on schedule and within estimated cost.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Air Traffic Control. Good Progress on Interim Replacement for Outage-Plagued System, but Risks can be further Reduced


    Erscheinungsdatum :

    1996


    Format / Umfang :

    40 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Management and IT errors plagued Housing Corp project

    British Library Online Contents | 2008


    Interim Developments in Air Traffic Control

    Greweil, Jack W. | SAE Technical Papers | 1962


    Interim developments in air traffic control

    Grewell, J.W. | Engineering Index Backfile | 1962