Agenda for this presentation is Exhaust options to reduce the launch numbers from 3 to 2: (1) Mass Reduction of Max-C Rover, ACO Orbiter, and or ACO ERS (2) Eliminate Max-C Rover (3) Launch vehicle options (4) Solar Sail for all interplanetary propulsion, chemical for maneuvering Goal would be to: (1) Brainstorm any other alternatives we have not considered (2) Eliminate any of the options listed above (3) Go forward with a possible viable option that is identified.
DEPLOYTECH: Mars Sample Return Concept Study Delta Results
2012
19 pages
Report
Keine Angabe
Englisch
DEPLOYTECH: Mars Sample Return Concept Study
NTRS | 2012
|DEPLOYTECH: Mars Sample Return Concept Study
NTIS | 2012
|Mars Sample Return Concept Status
NTRS | 2019
|Mars Sample Return Mission Concept Status
IEEE | 2020
|