The proposed project will consist of land acquisition, construction of a 1000-foot by 100-foot runway extension, apron expansion, a drainage culvert, extension of medium intensity runway lights and runway marking. The purpose of this extension-from 4200 feet to 5200 feet-- is to provide additional runway length in order to safely accommodate turbine and jet aircraft that are presently using the existing runway, as well as to serve higher performance aircraft that have been restricted from using the present facility because of its inadequate length. Due to careful site selection, good engineering design and attention to environmental details, this project will bring about no substantial adverse effects. (Author)
Ashtabula County Airport, Ashtabula, Ohio
1971
19 pages
Report
Keine Angabe
Englisch
Ports of Fairport, Ashtabula, and Conneaut, Ohio
Engineering Index Backfile | 1939
Engineering Index Backfile | 1906
The Lakeshore Park, Ashtabula, Ohio, Breakwater Project
HENRY – Bundesanstalt für Wasserbau (BAW) | 1989
|Engineering Index Backfile | 1942
|Engineering Index Backfile | 1909