Compares Towed Howitzer Cost to Construction Equipment on a per pound basis. Rate of inflation on Army equipment vis a vis Commercial Construction equipment. Develops a Cost Estimating Relationship for Howitzers based upon weight. (author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    A Study of Relative Cost of Army Towed Howitzers and Commercial Construction Equipment


    Beteiligte:
    T. J. Breen (Autor:in)

    Erscheinungsdatum :

    1980


    Format / Umfang :

    21 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    DDC's 8V71T, Low Heat Rejection Engine Developed for the U.S. Army Self Propelled Howitzers and Support Vehicles

    Swigart, John E. / Kuhn, Mark S. / Hinkle, Stanley J. et al. | SAE Technical Papers | 1990



    The U. S. Army Commercial Construction Equipment System Plan

    Stumm, Thomas A. | SAE Technical Papers | 1971