The report presents an evaluation of the operation of the North Freeway (I-45N) Transitway in Houston, Texas for calendar year 1987. The report provides an analysis of trend data related to: (1) operation of the transitway; (2) operation of the freeway mainlanes; (3) combined transitway and freeway mainlane data; and (4) data relating to transit usage and operations. In comparing A.M. peak-direction data from December 1984 with combined freeway mainlane and transitway data representative of December 1987: (1) peak-hour person movement has increased by 30%; (2) A.M. peak-hour vehicle occupancy has decreased by 4%; (3) peak-period bus passenger trips have increased by 83%; and (4) vehicles parked in corridor park-and-ride lots have increased by 23%.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    North Freeway Transitway: Evaluation of Operations during 1987. The Third Year of Operations


    Beteiligte:
    R. W. Stokes (Autor:in) / D. L. Christiansen (Autor:in) / S. E. Ranft (Autor:in)

    Erscheinungsdatum :

    1988


    Format / Umfang :

    106 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch