An Army Preliminary Evaluation of the preproduction OV-1D airplane (Mohawk), S/N 67-18899, was conducted by the US Army Aviation Systems Test Activity. During the period of this test, 33.9 hours were flown between 29 April 1969 and 14 May 1969 at Calverton, New York. The objective of this test was to evaluate performance and handling qualities of the airplane in various external store configurations.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Army Preliminary Evaluation Preproduction OV-1D (Mohawk)


    Beteiligte:
    W. A. Graham (Autor:in) / G. M. Yamakawa (Autor:in) / T. K. Wright (Autor:in)

    Erscheinungsdatum :

    1970


    Format / Umfang :

    129 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Army Preliminary Evaluation II. Production OV-1D (Mohawk) Performance Addendum

    G. M. Yamakawa / K. H. Brauer / W. A. Graham et al. | NTIS | 1972


    Army Preliminary Evaluation II Production OV-1D (Mohawk) Performance and Handling Qualities

    G. M. Yamakawa / W. A. Graham / K. H. Brauer et al. | NTIS | 1971


    Mohawk, the Mohawk "Pinto."

    Engineering Index Backfile | 1928


    Mohawk, the Mohawk "Pinto."

    Engineering Index Backfile | 1928