A system specification is presented for the spacecraft which forms ESA's contribution to a joint ESA/NASA Jupiter swingby out-of-ecliptic mission. The overall performance requirements are defined in terms of the primary performance requirements of the envisaged system and individual subsystems; launcher options and their performance capabilities; associated ground facilities in the time frame of interest; and other constraints as identified to date.
Solar out-of-Ecliptic Study. Appendix: System Specification
1976
43 pages
Report
Keine Angabe
Englisch