This case is divided into two parts: Part A describes the J52-P408 engine repair process prior to the implementation of AIRspeed at the AIMD Naval Air Station, Whidbey Island (NASWI) J52 engine repair shop. Part B discusses the post-implementation of AIRSpeed and the use of Value Stream Mapping (VSM) to eliminate non-value-added processes; the use of which resulted in increased productivity.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Naval Aviation Maintenance: A Case Study for Process Improvement


    Beteiligte:
    E. Jafar (Autor:in) / T. N. Mejos (Autor:in) / C. Yang (Autor:in)

    Erscheinungsdatum :

    2006


    Format / Umfang :

    46 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Naval Aviation Maintenance Decision Support System

    D. L. Allen / W. R. McSwain | NTIS | 1989


    Information Technology Comes To Naval Aviation Maintenance

    Dobry, T. / Smith, D. / Partusch, C. et al. | British Library Conference Proceedings | 2000



    Procedure for the Development of Naval Aviation Maintenance Objectives

    W. F. Lavallee / P. R. Seidenberg / W. J. Light et al. | NTIS | 1977