NASA has conducted a series of mission studies over the past 25 years examining the eventual exploration of the surface of Mars by humans. The latest version of this evolutionary series of design reference missions/architectures - Design Reference Architecture 5 or DRA-5 - was completed in 2007. This paper examines the implications of including a human mission to explore the moons of Mars and teleoperate robots in various locations, but not to land the human crews on Mars, as an element of this reference architecture. Such a mission has been proposed several times during this same 25 year evolution leading up to the completion of DRA-5 primarily as a mission of testing the in-space vehicles and operations while surface vehicles and landers are under development. But such a precursor or test mission has never been explicitly included as an element of this Architecture. This paper will first summarize the key features of the DRA-5 to provide context for the remainder of the assessment. This will include a description of the in-space vehicles that would be the subject of a shakedown test during the Mars orbital mission. A decision tree will be used to illustrate the factors that will be analyzed, and the sequence in which they will be addressed, for this assessment. The factors that will be analyzed include the type of interplanetary transfer orbit (opposition class versus conjunction class), the type of parking orbit (circular versus elliptical), and the type of propulsion technology (high thrust chemical versus nuclear thermal rocket). The manner in which each of these factors impacts an individual mission will be described. In addition to the direct impact of these factors, additional considerations impacting crew health and overall programmatic outcomes will be discussed. Numerical results for each of the factors in the decision tree will be grouped with derived qualitative impacts from crew health and programmatic consideration. These quantitative and qualitative results will be summarized in a pros/cons table as a summary for this analysis.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Phobos-Deimos Mission as an Element of the NASA Mars Design Reference Architecture 5.0


    Beteiligte:
    S. J. Hoffman (Autor:in)

    Erscheinungsdatum :

    2011


    Format / Umfang :

    24 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Phobos, Deimos Mission

    Mukhin, L. / Sagdeev, R. / Karavasili, K. et al. | British Library Conference Proceedings | 2000


    Mission Concept of Phobos/Deimos Exploration

    K. Matsushima / J. Saito / M. Utashima et al. | NTIS | 1993


    Mars-Phobos/Deimos libration points revisited

    Marcus, Guy / Gurfil, Pini | Elsevier | 2022


    The Mars moons Phobos and Deimos

    Deutsches Zentrum für Luft- und Raumfahrt (DLR) | TIB AV-Portal | 2013