Air traffic at Oslo airport is expected to double or triple by the year 2040. Both car and train traffic is expected to grow at the same pace as air traffic. Sufficient rail capacity may be provided by using longer trains. In a long term perspective towards 2040 road capacity seems to become insufficient.
Transport Til Fra Oslo Lufthavn i et Langsiktig Perspektiv (Road and Rail Transport to Oslo Airport in a Long Term Perspective)
2007
56 pages
Report
Keine Angabe
Englisch
Oslo Gardermoen Airport rail link opens this month
Online Contents | 1998
IuD Bahn | 1995
|The Oslo Airport Express train
IuD Bahn | 1999
|A brand new international airport - Oslo Airport Gardermoen
British Library Conference Proceedings | 1996
|