Planning Columbus on-board operations and management of the operational interfaces of the payload ground control team are discussed. Organizational aspects which need to be considered to arrive at a feasible operations structure are assessed, based on Spacelab experience.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Timelining and Operations Integration Concerning APM (Attached Pressure Module) and MTFF (Man Tended Free Flyer)


    Beteiligte:
    A. Davidson (Autor:in) / K. Wedde-Muehlhausen (Autor:in) / K. Schmidt (Autor:in)

    Erscheinungsdatum :

    1988


    Format / Umfang :

    9 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch