Management Consulting & Research, Inc. (MCR) collected data on the Total Obligational Authority (TOA) requested by the Army, Navy and Air Force to procure attack, bomber and fighter, fixed and rotary wing aircraft. The TOA was normalized to base fiscal year 1981 dollars. Lot average, cumulate average and unit costs were calculated for Airframe, Airframe and Engine on total flyaway cost where available. Data is presented for 128 Mission/Design/Series (MDS) aircraft. (Author)
US Military Aircraft Cost Handbook
1983
507 pages
Report
Keine Angabe
Englisch
Aircraft , Military aircraft , Cost analysis , Handbooks , Comparison , Performance(Engineering) , Cost models , Attack aircraft , Bomber aircraft , Fighter aircraft , Patrol aircraft , Attack helicopters , Planning programming budgeting , Quality , Cost estimates , Cost effectiveness , TOA(Total Obligational Authority) , Cost benefit analysis , Unit cost curves , Cumulative average cost curves , Escalation indices
Engineering Index Backfile | 1961
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1942