The proposed action is the construction of a road to provide better access to the flight line. The road will cross two branches of an unnamed stream that flows into Stoney Creek, a tributary of the Neuse River. The curbed road would be 28 wide and 2,700 feet in length. There would also be a 600 foot segment connecting the proposed road to an existing road. One stream crossing would use 48 reinforced concrete pipe with concrete headwalls and the other crossing would use dual 60 reinforced concrete pipe with concrete headwalls.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Environmental Assessment for Flight Line Access Road Seymour Johnson Air Force Base


    Beteiligte:
    L. Busch (Autor:in)

    Erscheinungsdatum :

    2009


    Format / Umfang :

    23 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch