With the high-speed railway put into operation, the types of trains in the existed line is reduced, train intervals will also be shortened. We analyze the impact of high-speed rail's operations on the basis of the calculation method of the interval passing capacity in existed line, for example in three major areas : the difference of train running time in the section, the proportion of trains dispatched in succession, the change of train tracking interval. From the definition of the removal coefficient calculation, we calculate the existing railway single line and double line transport capacity after release.
The calculation method research for transportation capacity release value of existing line after high-speed railway's operation
2017-09-01
266004 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
American railway's six new diesel locomotives
Engineering Index Backfile | 1938
|Canada weighs railway's future
Engineering Index Backfile | 1932
|Michigan railway's 2400-volt, third rail line
Engineering Index Backfile | 1915
Tobu Railway's Electric Inspection Car
British Library Online Contents | 2006
|Railway's contribution to American prosperity
Engineering Index Backfile | 1930
|