A 1:10-scale physical model of the discharge outlet, plunge pool, and exit channel was used to investigate and develop a practical design that would provide satisfactory hydraulic performance. Operation of the model with the original design indicated satisfactory performance in the conduits and jet flow gates. However, failure of the riprap in the plunge pool and exit channel was observed. The side slopes of the plunge pool and exit channel were modified to provide a stable environment for the riprap.
Little Dell Outlet Structure: Hydraulic Model Investigation
Technical Report ; HL-89-7
1989
5252196
Report
Elektronische Ressource
Englisch
Mud Mountain Outlet Structure: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1993
|Wax Lake Outlet Control Structure, Louisiana: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1988
|Old River Overbank Structure Outlet Modifications: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1980
|Little Sioux Control Structure, Little Sioux River, Iowa: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1986
|Lake Chicot Pumping Plant Outlet Structure, Arkansas: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1979
|