Under the Periodic Inspections work unit of the Monitoring Completed Coastal Projects Program. base level conditions have been established for above-water armor units on portions of the Cleveland Harbor East Breakwater. The vertical and horizontal positions of dolos and stone armor units over a cumulative 1,506 m 14,940 ft) of the breakwater have been defined through IimiteJ ground surveys, low-aititude aerial photography, and photograrnmetric analysis. A database of broken doles and stone armor units also has been established. The site will be revisited periodically in the future and the long-term structural response of the breakwater to its environment will be tracked. Theqc periodic data sets arc used to improve knowledge in design. construction. and maintenance of the existing structure as well as proposed future coastal projects.
Periodic Inspection of Cleveland Harbor East Breakwater, Ohio. Report 1, Base Conditions
Technical Report ; CERC-95-3 rept.1
1995
8754083
Report
Elektronische Ressource
Englisch
Monitoring of East Breakwater Rehabilitation at Cleveland Harbor, Ohio
HENRY – Bundesanstalt für Wasserbau (BAW) | 1993
|Periodic Inspection of Burns Harbor North Breakwater, Indiana. Report 1, Base conditions
HENRY – Bundesanstalt für Wasserbau (BAW) | 1996
|Periodic Inspection of Nawiliwili Harbor Breakwater, Kauai, Hawaii. Report 1, Base conditions
HENRY – Bundesanstalt für Wasserbau (BAW) | 1996
|HENRY – Bundesanstalt für Wasserbau (BAW) | 1985
|Wave Action and Breakwater Location, Vermilion Harbor, Ohio: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1970
|