Water levels, current speed, current direction, salinity, temperature, and suspended sediment samples were obtained in the Cape Fear River estuary from mid-August 1993 through mid-October 1993. The data were collected using long-term (45-60 days) moored equipment and short-term (two tidal cycles) boat-mounted measuring and sampling equipment. The data were collected to provide synoptic information on the hydrodynamics of the estuary for use in the verification of numerical models. This report describes the equipment and procedures used in the data collection effort and presents tables and plots of the data.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Field Data Collection Report, Cape Fear River, Wilmington, North Carolina



    Erschienen in:

    Erscheinungsdatum :

    1995


    Format / Umfang :

    3130442


    Medientyp :

    Report


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Klassifikation :


    Environmental Justice Evaluation: Wilmington Bypass, Wilmington, North Carolina

    Lane, Leigh Blackmon / Hoffeld, Scott / Griffin, David | Transportation Research Record | 1998


    Port of Wilmington, North Carolina

    Engineering Index Backfile | 1943



    Predesign Foundation Load Test Program for US-17 (Wilmington) Bypass over Northeast Cape Fear River

    Hidden, Scott / Abar, Nariman | Transportation Research Record | 2000


    Tybee Island, Georgia, to Cape Fear, North Carolina, 1851 - 1983

    Anders, Fred J. / Reed, David W. / Meisburger, Edward P. | TIBKAT | 1990