Under the Monitoring Completed Coastal Projects Program, an assessment of jetty rehabilitation at Manasquan Inlet, New Jersey, was performed. Objectives of the monitoring effort were to evaluate the performance of the dolos armor units in maintaining structural stability of the jetties, determine potential effects of the rehabilitated jetties on longshore sediment movement at the inlet, and determine the effectiveness of the rehabilitated jetties in maintaining a stable inlet cross section. Data collection for the monitoring program occurred from June 1982 to October 1984. Data on the performance of the project, observations noted in the prototype, and results of the data collection, as well as conclusions and recommendations based on the monitoring effort, are reported herein.
Monitoring of Jetty Rehabilitation at Manasquan Inlet, New Jersey
Miscellaneous Paper ; CERC-91-8
1991
8715506
Report
Elektronische Ressource
Englisch
Jetty Rehabilitation Stability Study Yaquina Bay, Oregon
HENRY – Bundesanstalt für Wasserbau (BAW) | 1988
|Jetty Stability Study, Oregon Inlet, North Carolina: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1983
|Rehabilitation and Strengthening of United Grain Growers Jetty # 3
British Library Conference Proceedings | 1998
|South Jetty Stability Study, Masonboro Inlet, North Carolina: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1978
|