The existing trifurcation and penstock system at Fort Peck Dam, Montana, is reaching the end of its design life and has been determined to have an unacceptable factor of safety. A proposed replacement trifurcation designed by Sulzer Escher Wyss was model tested to determine the flow conditions through the trifurcation and the energy losses associated with various flow combinations. Differential pressures measured across the trifurcation were used with an automated data collection system to determine the losses through the various segments of the trifurcation. Spot pressures were also collected within the trifurcation to determine the stability of the flow fields as they separated to pass through different penstock outlets. The proposed trifurcation was found to be acceptable; however, the energy losses were greater than anticipated based on design information. The existing control section located upstream of the trifurcation was studied to determine if simple modifications could reduce energy losses through the control section. The emergency gate slots were determined to cause the highest energy losses through the control section. Filling the emergency gate slots with an insert would significantly reduce the energy loss through the control section.
Fort Peck Tunnel No. 1 Rehabilitation, Fort Peck Dam, Montana
Technical Report ; HL-93-2
1993
1244346
Report
Elektronische Ressource
Englisch
Engineering Index Backfile | 1936
|Implementing safety toolkit on the Fort Peck Indian Reservation, Montana
DOAJ | 2020
|Determining Causal Factors of Severe Crashes on the Fort Peck Indian Reservation, Montana
DOAJ | 2018
|Peck Drilling of Composite/Metal Assemblies
SAE Technical Papers | 1996
|