To provide a method by which a management about calibrations is adequately realized in the case conditions of railroad wayside facilities are monitored based on measured data of instruments.SOLUTION: In a railroad wayside facility monitoring system 1, measuring terminals 30 installed in each railroad switch 50 send, to a central device 10, data measured by an instrument 32 which data are corresponded with a calibration completion date that is set and stored when the instrument 32 is calibrated and are handled as the measured data. The central device 10, based on the measured data received from the measuring terminals 30, carries out an inspection of the railroad switch 50 by a comparison of operation data about this one switching operation of the switch 50 with stored past operation data of the switch 50 that are regarded as reference data. An exchange time of the instrument 32 and/or the measuring terminals 30 is notified based on the completion date included in the measured data.SELECTED DRAWING: Figure 1


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    鉄道沿線設備監視システム及び中央装置


    Erscheinungsdatum :

    2023-01-25


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Japanisch


    Klassifikation :

    IPC:    B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / E01B PERMANENT WAY , Gleisoberbau / G01D MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE , Anzeigen oder Aufzeichnen in Verbindung mit Messen allgemein



    システム

    Europäisches Patentamt | 2024

    Freier Zugriff

    制御システム、遮断システム

    Europäisches Patentamt | 2024

    Freier Zugriff

    HUDシステム用光学システム

    Europäisches Patentamt | 2023

    Freier Zugriff

    システム

    Europäisches Patentamt | 2021

    Freier Zugriff

    システム

    Europäisches Patentamt | 2016

    Freier Zugriff