To reduce influence to a construction period due to change in utility facilities of a production facility installed on a hull shaped offshore floating body structure.SOLUTION: A structure for living quarters 24 is arranged closer to the stern side than a hull central unit 14 composing a cargo section in a hull shaped floating type production storage and offloading facilities (offshore floating structure)10. A multi purpose deck 26 is structurally separated from the structure for living quarters 24 as well as being arranged above an upper deck 18A on the stern side of the structure for living quarters 24. Utility facilities 28 with its specification dependent on the specification of production facilities 20 of the floating type production storage and offloading facilities 10 is installed on the multi purpose deck 26.SELECTED DRAWING: Figure 1
【課題】船体形洋上浮体構造物に設置される生産設備のユーティリティ設備の変更による工期への影響を低減する。【解決手段】船体形の浮体式生産貯蔵積出設備(洋上浮体構造物)10において、貨物区画を構成する船体中央部14よりも船尾側に居住区用建造物24を配置する。居住区用建造物24とは構造的に分離されるとともに、居住区用建造物24の船尾側の上甲板18Aの上方に多目的デッキ26を配置する。浮体式生産貯蔵積出設備10の生産設備20の仕様にその仕様が依存するユーティリティ設備28を多目的デッキ26上に設置する。【選択図】図1
OFFSHORE FLOATING BODY STRUCTURE AND ITS STERN STRUCTURE
洋上浮体構造物およびその船尾構造
2019-01-31
Patent
Elektronische Ressource
Japanisch
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |