The present invention relates to a method for installing or mounting a tower (1) formed by the stacking of two or more mounting groups (2, 2') on a base section (3), wherein at least one of said mounting groups (2, 2') is formed by a plurality of stacked segments (4, 5, 4', 5'). Said method comprises: arranging the base section (3) in the definitive position thereof on the ground; and lifting and placing the mounting groups (2, 2') of the tower (1) on the base section (3) by means of a mounting crane that can adopt different jib configurations. Advantageously, in said method at least two or more stacked segments (4, 5, 4', 5') are installed consecutively in the corresponding mounting group (2, 2') with the same crane jib configuration, wherein the length (I4, I4') of the lowest stacked segment (4, 4') of said mounting group (2, 2') is smaller than the length (I5,I5') of at least another stacked segment (5, 5') of the aforementioned mounting group (2, 2').
PROCEDIMIENTO DE INSTALACION DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
2024-04-16
Patent
Elektronische Ressource
Spanisch
PROCEDIMIENTO DE INSTALACIÓN DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
Europäisches Patentamt | 2023
|Procedimiento para el desplazamiento de una grúa giratoria de torre
Europäisches Patentamt | 2019
|