The invention relates to the technical field of super high-rise construction, in particular to a super high-rise crystal and non-crystal curtain wall construction hoisting method which comprises the steps that an adjusting ring is arranged on the surface of an adjusting pipe, a second clamping seat is arranged on the lower side of a first clamping seat, and a hanging lug is arranged on the upper surface of a unit plate curtain wall; the unit plate curtain wall hoisting device has the beneficial effects that when the unit plate curtain wall needs to be stably hoisted to a required mounting position, the stabilizing cable is adjusted to a proper position by adjusting the adjusting ring on the surface of the adjusting pipe, so that the stabilizing cable is not easy to shake, and then the unit plate curtain wall is slowly hoisted through the hoisting mechanism; in the hoisting process, the first clamping seat and the second clamping seat are sequentially installed on the upper side and the lower side of the side frame of the unit plate curtain wall through the clamping spring and the clamping block, so that the unit plate curtain wall is limited by the first clamping seat and the second clamping seat on the surface of the stabilizing cable in the process of being hoisted to the installation position. The lifting mode can ensure that the left side, the right side, the upper side and the lower side of the unit plate curtain wall are limited.

    本发明涉及超高层施工技术领域,具体为一种超高层晶体及非晶体幕墙施工吊装方法,包括:调节管表面设置有调节环,第一卡座下侧设置有第二卡座,单元板块幕墙上表面设置有挂耳;有益效果为:当要将单元板块幕墙稳定吊装到所需的安装位置处时,先通过调节调节管表面的调节环来将稳定缆绳调节到合适位置并使稳定缆绳不易发生晃动,接着通过吊装机构将单元板块幕墙缓慢吊起,在吊起过程中通过卡紧弹簧及卡块将第一卡座和第二卡座依次安装在单元板块幕墙侧边框的上下两侧,从而使单元板块幕墙在被吊装到安装位置处的过程中受到稳定缆绳表面的第一卡座及第二卡座的限制,这种吊装方式可以保证单元板块幕墙的左、右及上、下两侧受到限制。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Construction hoisting method for super high-rise crystal and amorphous curtain wall


    Weitere Titelangaben:

    一种超高层晶体及非晶体幕墙施工吊装方法


    Beteiligte:
    ZHANG ZHEN (Autor:in) / ZHANG ZHICHAO (Autor:in) / PEI XINTONG (Autor:in)

    Erscheinungsdatum :

    2024-05-28


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B66C Krane , CRANES



    Hoisting method of super high-rise building curtain wall unit plate

    FENG XIANGYU / LIU DONG | Europäisches Patentamt | 2023

    Freier Zugriff

    Super high-rise curtain wall hoisting system based on 5G technology

    WANG WEIGUANG / CHEN JIYUN / WANG YUANYUAN et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Hoisting structure for curtain wall units of high-rise and super high-rise buildings

    ZHANG XINBIN / WENG XILIN | Europäisches Patentamt | 2020

    Freier Zugriff

    Super high-rise inward-inclined glass curtain wall circular rail hoisting device and construction method thereof

    ZHANG KANGSHENG / ZHOU YANG / LUO JIA et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Irregular facade super high-rise building unit type curtain wall hoisting system

    LI XINGWANG / GE XIANFENG / LYU QIUJIE et al. | Europäisches Patentamt | 2023

    Freier Zugriff