The invention discloses a hydrological cableway multi-vertical-line flow measurement system and method, and belongs to the technical field of hydrological flow measurement. The flow measuring system comprises tower frames arranged on the two banks of a river channel, a circulating cable is arranged between the tower frames, a traveling crane is installed on the circulating cable, a main cable is further arranged between the tower frames, a plurality of pods are hung on the main cable and used for loading flow measuring equipment, and the traveling crane is used for moving the hanging positions of the pods on the main cable. According to the invention, through cooperation of the circulating cable and the travelling crane, the plurality of pods can be moved in sequence and hung to the designated position of the main cable, so that layout support is provided for simultaneous water entry of flow measurement equipment at different positions on the cross section of a river channel, simultaneous measurement of a plurality of measurement instruments can be realized, and improvement of measurement precision is facilitated; a plurality of testing instruments simultaneously enter water for testing, so that the water entering time of equipment is shortened, and the service life of the equipment is prolonged; the flow measuring equipment can be automatically conveyed and recycled, the investment of human resources is reduced, and the labor intensity of hydrological workers is reduced.

    本发明公开了一种水文缆道多垂线测流系统及方法,属于水文测流技术领域。测流系统包括设置在河道两岸的塔架,塔架之间设有循环索,循环索上安装有行车,塔架之间还设有主索,主索上吊挂有若干个吊舱,吊舱用于装载测流设备,行车用于移动吊舱在主索上的吊挂位置。本发明通过循环索与行车配合,可将多个吊舱依次移动并吊挂到主索的指定位置,为河道断面上不同位置的测流设备同时入水提供布设支持,可实现多个测验仪器同时进行测量,有利于测量精度的提升;多个测验仪器同时入水测验,减少设备的入水时间,延长设备使用寿命;测流设备可自动运送和回收,减少人力资源的投资,降低了水文工作者劳动强度。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Multi-vertical-line flow measurement system and method for hydrometric cableway


    Weitere Titelangaben:

    一种水文缆道多垂线测流系统及方法


    Beteiligte:
    YU YANG (Autor:in) / CHEN LIZHE (Autor:in) / WU YUXI (Autor:in) / REN TONG (Autor:in) / LIU XINYANG (Autor:in) / WANG XUDONG (Autor:in) / QI TIANLONG (Autor:in) / LI CHUNMING (Autor:in)

    Erscheinungsdatum :

    2024-04-09


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    F16M Rahmen, Gehäuse oder Grundplatten von Kraftmaschinen oder anderen Maschinen oder von Apparaten, nicht auf eine besondere Art von Maschine oder Apparat eingeschränkt, die anderweitig vorgesehen ist , FRAMES, CASINGS, OR BEDS, OF ENGINES OR OTHER MACHINES OR APPARATUS, NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUS PROVIDED FOR ELSEWHERE / B66C Krane , CRANES / G01C Messen von Entfernungen, Höhen, Neigungen oder Richtungen , MEASURING DISTANCES, LEVELS OR BEARINGS



    Hydrometric cableway charging system

    HUANG YI / MA SONGGEN / QIN MINGJIA | Europäisches Patentamt | 2024

    Freier Zugriff

    Cableway line steel wire rope tensioning device and cableway system

    LI GANG / JIANG HONGQI / LIU JIA et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Multi-section cableway control method and multi-section cableway control device

    DUAN YAN / JIA RUIXI / FENG XIANZONG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Cableway and method for operating cableway

    HECK JOHN / DUERR GERD | Europäisches Patentamt | 2024

    Freier Zugriff

    Cableway hanging seat guardrail lifting device, cableway hanging seat assembly and cableway system

    LI XIN / LIU JIA / HUANG YUEFENG et al. | Europäisches Patentamt | 2020

    Freier Zugriff