The invention discloses a gas pipeline construction method, relates to the technical field of pipeline construction, and is used for constructing a gas pipeline, and the gas pipeline construction method is realized through gas pipeline construction equipment. When the bearing plate moves downwards, the connecting frame drives the clamping frame to move downwards along with the bearing plate, at the moment, the limiting rod does not apply pressure to the arc-shaped block, the arc-shaped block controls the connecting plate to rotate under the elastic force matched with the spring, and the connecting plate controls the elastic frame and the elastic piece to be in a flexible state through the connecting rod and controls the clamping frame to clamp a pipeline. When the bearing plate moves upwards and the limiting rod extrudes the arc-shaped block, the elastic frame and the elastic piece are converted into a rigid state, the clamping frame drives the clamped pipeline to ascend, and then the pipeline is in butt joint with other pipelines. The clamping state of the clamping frame is changed by means of the deformation force of the elastic frame and the elastic piece, clamping and transportation of the pipeline are achieved, and manual labor is effectively reduced.
本发明公开了燃气管道施工方法,涉及管道施工技术领域,用于对燃气管道进行施工,燃气管道施工方法通过一种燃气管道施工设备来实现;承载板向下运动时,连接架带动夹持架跟着承载板向下运动,此时限位杆没有对弧形块施加压力,弧形块在配合弹簧的弹力下控制连接板进行转动,连接板通过连接杆控制弹性架与弹性片呈柔性状态并控制夹持架对管道进行夹持,当承载板向上运动并实现限位杆对弧形块挤压时,此时弹性架与弹性片转化为刚性状态并实现夹持架带动夹持的管道上升,随后与其它管道进行对接工作,相对于现有技术,本发明通过借助弹性架与弹性片形变的力改变夹持架的夹持状态并实现对管道的夹持与运输,有效减少人工劳动力。
Gas pipeline construction method
燃气管道施工方法
2024-01-05
Patent
Elektronische Ressource
Chinesisch
Pipeline laying construction method for municipal construction road construction
Europäisches Patentamt | 2023
|Pipeline hoisting equipment for pipeline construction laying
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Electromechanical integrated pipeline installation construction method
Europäisches Patentamt | 2023
|